Go
New/Post
Find
Notify
Tools
Reply
  
-star Rating Rate It!  Login/Join 
New Member
Posted
Hello to those interested in the tram.

I am posting this message as a offer to assist with this project as I am a consulting engieering living in Fairfield and specializing in rotating machines and control. Set up, design, layout, modifications in the traction system for the tram would be of keen interest to me,.. aside from the fact that it would help the Jungle in its growth. Below is a link on my basic info and if I can be of assistance please contact me ,.. or I visit Starbucks frequently,.. catch up with me there,...

Jeff W

Technical Consultant
 
Posts: 1 | Registered: September 17, 2006Reply With QuoteEdit or Delete MessageReport This Post
Super Foodie
Posted Hide Post
Jeff,
Thanks for the offer. I will keep you posting. At this time, we are ready to install more track. As you probably noted, most of the columns are in the ground. The track going to the snack building should go in soon. 3 of the trains are ready to go. Rockwell International gave us several engineers to complete the trains several years ago. Hope to see the trains running in the next year.

Thanks Again!
Phill Adams
Director of Develepment
Jungle Jim's
 
Posts: 61 | Registered: September 20, 2004Reply With QuoteEdit or Delete MessageReport This Post
 Previous Topic | Next Topic powered by eve community  
 


5440 Dixie Highway - Fairfield, Ohio - 45014 - Phone 513-674-6000 - Fax 513-674-6001
© 2008 - All rights reserved.

These messages boards are not moderated by Jungle Jim's International Market employees. If you have store-related questions please email contactus@junglejims.com. This board is sponsored by Jungle Jim’s International Market but does not represent the opinions of Jungle Jim’s International Market, it’s owners, administrators or forum moderators. This forum is for you to meet and ask questions of each other. Jungle Jim’s International Market may not be held liable for any content on these message boards.